Took me an hour and a quarter (or more) to do what is usually a 30-40 minute journey between Bridgend and Cardiff earlier this evening. In fact, it took me about 30 minutes to cover the last 5 or 6 miles. OK, it was around 5pm, but several roads that I could have used were/are closed due to flooding!!
Was over near Bridgend to do a Safe Use of Pesticides using Specilaised Equipment course for the day. Absolutely chucked it down most of the day, and trying to work out the swathe width (the spread of the spray from a nozzle) on the already soaking ground was all-but pointless. Just have to hope that Dec 13th, when I'm assessed, will be dry!
The specialised equipment was a 50-year old shunting diesel loco with a purpose-built spray boom on its back (purpose-built by one of the railway's volunteers).